Q143Section III (Statistics)143 of 145
Rectifying inspection: always, plus when the lot is rejected
With lot size N, lot quality and acceptance probability , if a sample of size is taken under rectifying inspection, the average total inspection per lot will be:
Pick an option to check your answer.